How We Work

Our Floor Coating Installation Process

Every project follows the same disciplined sequence — because a lasting floor is built step by step, not rushed.

  1. 01

    Consultation & Site Review

    We review your space, how the floor is used, and your goals — in person or from your details.

  2. 02

    System Recommendation

    We recommend the coating system, finish, and topcoat matched to your environment and budget.

  3. 03

    Surface Preparation

    Diamond grinding or shot blasting opens the concrete profile so the coating bonds mechanically.

  4. 04

    Concrete Repair / Joint Fill

    Cracks, spalls, pits, and control joints are repaired and filled for a sound, uniform base.

  5. 05

    Primer or Moisture Barrier

    Where needed, a primer or moisture vapor barrier is applied to protect the finished system.

  6. 06

    Base Coat / Build Coat

    The pigmented base or build coats are applied to establish thickness and color.

  7. 07

    Quartz, Flake, Metallic, or Finish System

    Decorative media or the specified finish system is installed for texture, color, and grip.

  8. 08

    Topcoat / Protective Coating

    A durable, UV-stable topcoat locks in the system and adds abrasion and chemical resistance.

  9. 09

    Final Walkthrough

    We review the finished floor with you, confirm cure times, and cover simple care steps.

Let's get your project scheduled.

Tell us about your floor and we'll walk you through the right system and timeline.

Call Get Free Quote